Project Alignment and Station Location

The project starts at PhuketInternational Airport which will be an elevated structure running along the highway number 4031. Therefrom, the alignment will be lowered to the at-gradeon the highway number 4026 and continue its path through the highway number402, heading toward to Phuket city. After that, the alignment will be loweredto underground level approximately 3 kilometers at Thalang district, before lifted back tothe ground level normally.

The route will pass Thao Thep Krasattri and Thao Sri Sunthon Monument (The Two HeroinesMonument), Phuket bus terminal, Phuket Municipality and Phuket Road, beforecrossing the Thepsrisin Bridge in order to enter into ChaoFa (East) Road (the highway number4021) and terminating its route at Chalong Intersection with the totaldistance of 42 kilometers